Home / Maintenance services / Battery Load & Capacity Testing

Battery Load & Capacity Testing for UPS, Central Battery and Generator Batteries(Riyadh, Jeddah & Dammam)

A battery that looks healthy on float charge can still fail within minutes of a power cut. Star House carries out battery load and capacity (discharge) tests on uninterruptible power supply (UPS) batteries, central battery systems (CBS) for emergency lighting and generator starter batteries — measuring how much back-up time your batteries really deliver, and giving you a clear report on what to keep and what to replace.

Battery Load & Capacity Testing

What's included

  • Capacity (discharge) testing with calibrated DC load banks
  • Block-by-block voltage logging throughout the test
  • Internal resistance (impedance) and float-voltage checks
  • Thermal imaging of terminals, links and cables
  • Generator starter-battery load and cranking checks
  • Test report with capacity %, weak blocks and recommendations

Which batteries we test

  • UPS battery strings and cabinets — VRLA, vented lead-acid and lithium-ion
  • Central battery systems (CBS) that power emergency lighting and exit signs
  • Generator starter batteries and battery chargers
  • DC systems for switchgear tripping, telecoms and security equipment
  • Standby batteries in fire alarm control panels

How a capacity test is carried out

We agree the test with you first, because the batteries are taken off their normal duty while it runs. The UPS is placed on bypass or the load is carried by a redundant module, and the battery string is discharged into a calibrated DC load bank at a constant current or constant power that matches its rated duty — for example the back-up time the UPS was specified for. Throughout the test the voltage of every block, the string current and the temperature are logged. The test stops at the agreed end voltage, the result is corrected for temperature and expressed as a percentage of rated capacity, and the batteries are then recharged and returned to service.

Standards and pass / fail criteria

Testing follows the methods in IEEE 450 (vented lead-acid), IEEE 1188 (VRLA) and the battery manufacturer's discharge tables. A string that delivers less than 80% of its rated capacity is generally considered at end of life and should be replaced, and individual blocks that fall well below the string average are identified before they drag the others down. For central battery emergency lighting systems, the full rated-duration test — 90 minutes under NFPA 101 and the Saudi fire code, or one or three hours on systems designed to European or British standards — confirms that escape routes stay lit for as long as the design requires.

What you receive

Every test is documented in a written report: battery details and age, test method and load, the discharge curve, the voltage of every block at the end of the test, temperature, measured capacity as a percentage of rating, impedance results and photos of any defects. The report ranks blocks from weakest to strongest and gives a clear recommendation — keep, monitor or replace — with the back-up time you can expect. Typical clients are data rooms, trading floors and corporate offices, hospitals and healthcare facilities, telecom rooms, malls and warehouses across Riyadh, Jeddah, Dammam and the rest of the Kingdom.

Sectors we serve

Offices (core sector)MallsHospitalsWarehousesSchools

We serve clients all over Saudi Arabia — Riyadh, Jeddah, Dammam, Al Khobar, Dhahran, Jubail, Makkah, Madinah and Al-Kharj — from our head office in Riyadh (Building 2388, Al Aziziyah District).

Frequently asked questions

What is the difference between an impedance test and a capacity test?

An impedance (internal resistance) test is a quick check that shows how each battery block is ageing compared with the others. A capacity or discharge test actually draws the rated load for the rated time, so it proves how much back-up time the battery string can really deliver. Most sites trend impedance at every visit and run a full capacity test once a year, or when new batteries are accepted.

How often should batteries have a capacity test?

A full capacity test is commonly done once a year for critical UPS and central battery systems, when new batteries are accepted, and more often as a battery approaches end of life. Impedance and voltage checks are done at every maintenance visit in between.

Will the test interrupt our power?

Not when it is planned properly. The UPS is put on bypass or a redundant module carries the load, and the test is timed for low-risk hours. Because the batteries are partly discharged afterwards, we agree a recharge window with you before the site returns to normal.

Can you replace the weak batteries you find?

Yes. We supply and install matched replacement batteries, re-test the string and dispose of the old batteries safely. For older strings we usually recommend replacing the whole string rather than mixing new and old blocks.

Which areas do you cover?

We serve clients all over Saudi Arabia — Riyadh, Jeddah, Dammam, Al Khobar, Dhahran, Jubail, Makkah, Madinah and Al-Kharj — from our head office in Riyadh (Building 2388, Al Aziziyah District).

Get a free site survey

Tell us about your building — we'll inspect your systems and send a clear, single-contract proposal.