UPS battery replacement across two floors of a live office

Financial-services office · Riyadh · Completed June 2026

The challenge

The UPS systems protecting two floors of a busy corporate office needed new batteries. Ageing batteries mean shorter backup time — and a real risk that a power cut takes down critical equipment.

What we did

Star House supplied and installed 112 new VRLA UPS batteries (Yuasa SWL series) across both floors. The work was planned and carried out inside an occupied office, with the old batteries removed for safe disposal.

The result

Both floors' UPS systems back to full backup capacity on fresh batteries, with a clear replacement date logged for the future.